Cobb County
Complete architectural and engineering services for Cobb County's Fire Station No. 7, led by Project Architect Mark Freeman. After 40 years, the old station was due for replacement, and the program went well beyond a simple replacement: the new facility is also one of two dedicated Heavy Rescue Squads serving the southern part of Cobb County.
The design includes an enhanced roof structure for rooftop training. The multi-level training space adapts to different scenarios, including high-rise, rope and ladder training, and the added structure lets crews run drills inside the apparatus bay when needed.
A 4-bay garage and the adjacent two-story section provide sleeping quarters for up to 15 firefighters per shift, with an 800 SF training and meeting room on the second level. The 17,200 SF building has dedicated areas for gear storage, cleaning, food preparation, living areas and offices. Careful site planning lets the detention pond double for pump training. Completed in October 2021.
Mark Freeman performed the role of Project Architect when contracted with another architectural firm.